Lillie Square Phase 2

Earls Court, London

Ellmer carried out the bespoke manufacture of 362 pre-fabricated bathroom pods at Mitcham for Wates/Capco as part of their Lillie Square Phase 2 works.

The bathrooms come complete with 20mm stone, full height glazed bath/shower screens and bespoke veneered vanity units. The bathrooms arrived to site fully complete, tested, snagged and protected.

The deliveries were carried out using Ellmer’s bespoke green pod lifters, which removed the requirement for lifting points to be designed and tested per module, and allowed all lifts to be carried out quickly and in a safe manner.

All deliveries to site were undertaken in-house via Byrne Bros. vehicles, which enabled ease of coordination and timely deliveries to suit our 'just in time' delivery strategy. The pods were then craned to level and placed into position by Ellmer staff for final connections by others.

We implemented a thorough inspection, testing and quality plan encompassing 28 individual check sheets per bathroom.

We requisitioned the bespoke manufacture of 3 bathroom pod lifters from Samson Lifting.

Location

Earls Court, London

Client

Capco

Main Contractor

Wates

Architect

EPR Architects

M&E Consultant

Vulcan Building Services

One Nine Elms

Vauxhall, London

Top

Share