8 - 10 Moorgate

London EC2M

The works at 8-10 Moorgate for the Trade Package 4250 WC Fit-Out, incorporated the design, procurement, installation, execution and completion of the fit out to main core WC areas ground to eighth floor and satellite WC areas on the first to fourth floors.

The works at 8-10 Moorgate for the Trade Package 4250 WC Fit-Out

Location

London EC2M

Architect

TP Bennett

Project Manager

GVA Second London Wall

Quantity Surveyor

Turner and Townsend

Structural Engineer

Watermans

Rammamere House

Buckinghamshire

Top

Share