This state of the art hospital delivered via Private Finance Initiative (PFI) provided a new 800 bed hospital located within grounds of an existing hospital facility with phased demolition. The new hospital is approximately 110,000m2 in area arranged over 3 – 8 storeys. The site slopes from Clinical block 1 to 9, resulting in ground level variations between level 0 & 1.
The new hospital is approximately 110,000m2 in area arranged over 3 - 8 storeys.
These works were undertaken within an operational hospital that borders the site, a tight access point and a rapid programme, meaning multi handover and back dates with little or no space between the trades.
The upper floors