Logistically challenging and complex reinforced concrete substructure comprising 3 storey basement constructed around extensive, multiple tiered temporary propping with a 7 storey reinforced concrete Superstructure above, supported by anti-vibration bearings at 1st floor level from which the lift shafts to all levels below were hung.